
Modules
The digital Gemba board: SQCD indicators and the daily meeting
Safety, quality, delivery and cost indicators; data rolled up from sub-boards to the plant; and a presentation view.
30 September 2026 · 1 min
Warehouses, basements and yards don't always have internet. We spell out the scope and limits of offline work.
26 September 2026 · 1 min read

The field kit keeps the phone useful where the connection is weak. Its scope is deliberately narrow: work that can be done offline is kept apart from work that must be online.

Approving, completing an audit and viewing someone else's record need a connection, because they must use current permissions and current data. When the connection returns, drafts are sent in order and the person is asked if there is a conflict.
Drafts waiting on the phone are kept in an encrypted local vault and cannot be opened once the session ends. Sensitive record types (such as those with health data) are never taken offline.

Modules
Safety, quality, delivery and cost indicators; data rolled up from sub-boards to the plant; and a presentation view.
30 September 2026 · 1 min

Modules
Text clean-up, similar records, root-cause suggestions and a weekly summary. We say clearly where AI stops.
28 September 2026 · 1 min

Modules
Which work stops when someone leaves? Knowing the answer in advance with position criticality, leaving risk and a backup pool.
24 September 2026 · 1 min