Skip to content
Öneri Kaizen
Öneri Kaizen.

The 8 wastes in lean manufacturing: how to see them on the floor

From waiting to overproduction, from unnecessary motion to unused talent. The eight wastes with examples and how to measure them.

1 October 2026 · 1 min read

Yamazumi chart: station loads and the takt line
Sample company · demo data

Lean thinking starts by treating any work the customer would not pay for as waste. Reducing waste usually takes attention, not investment.

The eight wastes

  • Overproduction: making too much or too early.
  • Waiting: stopping for material, approval or a machine.
  • Transport: moving material more than needed.
  • Over-processing: precision or steps the customer did not ask for.
  • Inventory: piles of WIP and finished goods that hide flow.
  • Motion: searching, reaching, walking.
  • Defects: scrap, rework, complaints.
  • Unused talent: not asking employees for their ideas.

Measure to see

Waste shrinks only once it is visible. A time study splits an operation's steps into value-adding, necessary non-value-adding and waste. A Yamazumi chart stacks these steps per operator; the station above takt time stands out at once.

Stopwatch step timing: value-adding and waste steps
Sample company · demo data

The eighth waste, unused talent, is the reason suggestion and Kaizen systems exist: the person who does the job every day sees the other seven best.

Related posts