
Lean manufacturing · Kaizen
The PDCA cycle: the order behind Kaizen
Plan, do, check, act. Where each step of the cycle sits in an improvement record.
13 October 2026 · 1 min
From waiting to overproduction, from unnecessary motion to unused talent. The eight wastes with examples and how to measure them.
1 October 2026 · 1 min read

Lean thinking starts by treating any work the customer would not pay for as waste. Reducing waste usually takes attention, not investment.
Waste shrinks only once it is visible. A time study splits an operation's steps into value-adding, necessary non-value-adding and waste. A Yamazumi chart stacks these steps per operator; the station above takt time stands out at once.

The eighth waste, unused talent, is the reason suggestion and Kaizen systems exist: the person who does the job every day sees the other seven best.

Lean manufacturing · Kaizen
Plan, do, check, act. Where each step of the cycle sits in an improvement record.
13 October 2026 · 1 min

Lean manufacturing
One topic, one page, plenty of visuals. The pattern for passing on knowledge in five minutes on the floor, and tracking who read it.
12 October 2026 · 1 min

Lean manufacturing
The same problem exists on other lines and in other plants. How to plan and track the roll-out of a good practice.
11 October 2026 · 1 min