
Lean manufacturing · Kaizen
The PDCA cycle: the order behind Kaizen
Plan, do, check, act. Where each step of the cycle sits in an improvement record.
13 October 2026 · 1 min
Warning or shutdown? Contact, fixed-value and motion-step methods, and how to record a Poka-Yoke.
7 October 2026 · 1 min read

Poka-Yoke are simple devices that prevent a mistake or stop it passing unnoticed, instead of blaming the person. The best Poka-Yoke are cheap and come from the operator.
Poka-Yoke can be set up as a record type: which mistake it prevents, its type, before–after photos and verification. A Poka-Yoke made in one area can be sent as a roll-out suggestion to other areas with similar lines.


Lean manufacturing · Kaizen
Plan, do, check, act. Where each step of the cycle sits in an improvement record.
13 October 2026 · 1 min

Lean manufacturing
One topic, one page, plenty of visuals. The pattern for passing on knowledge in five minutes on the floor, and tracking who read it.
12 October 2026 · 1 min

Lean manufacturing
The same problem exists on other lines and in other plants. How to plan and track the roll-out of a good practice.
11 October 2026 · 1 min