
Lean manufacturing · Kaizen
The PDCA cycle: the order behind Kaizen
Plan, do, check, act. Where each step of the cycle sits in an improvement record.
13 October 2026 · 1 min
From long-term goals to annual goals, then to projects and indicators. The four arms of the X-matrix and how to read it.
10 October 2026 · 1 min read

Hoshin Kanri deploys a company's few main goals through every layer in the same direction. The aim is for everyone to know which goal their work serves.
Relationship grids at the corners mark which project serves which annual goal and which indicator tracks which project. A project or goal nobody is linked to stands out at once.

Indicators are tracked on scorecards; when they drift, a countermeasure action is opened. At the annual review the matrix is rebuilt.


Lean manufacturing · Kaizen
Plan, do, check, act. Where each step of the cycle sits in an improvement record.
13 October 2026 · 1 min

Lean manufacturing
One topic, one page, plenty of visuals. The pattern for passing on knowledge in five minutes on the floor, and tracking who read it.
12 October 2026 · 1 min

Lean manufacturing
The same problem exists on other lines and in other plants. How to plan and track the roll-out of a good practice.
11 October 2026 · 1 min